Aerial Rigging, Inc., is the preferred in-house rigging contractor for Sanibel Harbor Marriott Resort & Spa. Our primary obligation is to ensure that all rigging is carried out in a safe efficient manner. We must approve your rigging design to ensure that it is efficient and that it does not exceed approved loads.
We are responsible to install and dismantle all your equipment needs that require rigging. We are responsible to the hotel to ensure that we respect the structural limitations of the meeting rooms as established by their engineers, and to safeguard all the hotel equipment and installations. Aerial will exclusively provide all necessary chain hoist motors and rigging supplies.
We encourage you to download the CADs of the Ballrooms. During your design phase, please contact us regarding the specific rigging requirements for your event. We will require, 14 days prior to load in, a plot plan showing all lighting, audio, video, and scenic equipment that requires rigging. Your drawings can be faxed or e-mailed to us in DWG, DWF, or EPS format.
Aerial will submit a quote detailing our estimate of the cost of the work to be performed and services to be provided. Clients must sign and return the quote prior to any work performed or services provided. There will be no exceptions made to this. We fully understand that running an event can be very stressful. It is our objective to provide you with all the cooperation, technical assistance, labor services, and equipment you require, while at the same time discharging our responsibilities to ensure adherence to OSHA safety requirements and the need to safeguard the assets of Sanibel Harbour Marriott Resort and Spa. We appreciate your business and promise you that we will do everything in our power to ensure the success of your event.
Services Provided by Aerial Rigging
1. Rigging Labor
We suspend truss, lighting, speakers, projection screens, monitors, projectors, plasma screens, speaker clusters, etc., from the ceilings. CAD's show the location of all the permanent points. We must review and approve all rigging plots in advance to ensure that they are safe, workable, and that they respect the load limits of the building. We must receive these rigging plots at least fourteen (14) days in advance of an event. We can rig the ballrooms to provide for a professional caliber performance or concert.
Straight Time: Monday – Friday 8:00am – 5:00pm:
Time and One Half: Monday – Friday 5:00pm – 12:00am: Sunday: 8:00am – 12:00am
Double Time: Monday – Sunday 12:00am – 8:00am: Saturday: 8:00am – 12:00am:
Special Conditions: Holidays* - Christmas Day, New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving.Time and one half will apply over eight (8) hours of continuous work or over forty (40) hours a week.Minimum call will be four (4) hours.There is a mandatory 1 hour meal break every five (5) hours.The number of men required for a call will be determined exclusively by Aerial Rigging We will use the minimum number of men without sacrificing safety.All prices and rates are subject to change.All changes in labor calls must be called into the Aerial Rigging office. On site staff cannot change call times. If less than twenty-four (24) hour notice, the client will be billed for any changes.
2. Chain Hoist Motors & Rigging Supplies
The chain hoist motor is the critical piece of equipment that lifts the truss and equipment attached thereto off the floor and keeps the rig suspended at the ceilings. As a result of safety and liability concerns, Aerial provides all chain hoist motors and related gear, as we can ensure that the chain hoists are certified and are in proper working order.
Preferred Services Provided by Aerial Rigging
1. Truss
Aerial has thousands of feet available at it's regional showroom. Truss size and styles include spigot, efficient fork, and nut/bolt in 12x12 box, 20x20 box, triangle, DJ style, and includes both silver and black. We can also do an extensive array of shapes including circles, diamonds etc
2. Labor
We have a reliable staff of exerienced and trustworthy stagehands at market prices. Let Aerial serve all of your staffing needs.
Specific Guidelines
- No rigging is permitted from the air-wall tracks.
- A plot plan showing the rigging requirements and detailing the weights to be supported must be submitted 14 days prior to your event. Aerial will review this plan in order to determine whether it respects the load limits.
- Any rigging modifications, additions, or deletions to the plot plan must be approved in advance by Aerial. The cost of any changes to an installation necessitated as a result of not having these changes approved in advance will be borne by the client.
- Equipment that has already been “flown” can be moved only by Aerial..
- Items attached to the ceilings must be a minimum of eight (8) feet above the floor.
- Climbing on equipment once equipment it has been “flown” is prohibited.
- Any equipment to be added to a hung rig must be installed by Aerial.
- The per point load limit in the Ballrooms is 750 lbs.
- All equipment and materials flown must pass A.N.T.S.E. and ESTA standard guidelines.
- All truss used must be manufactured by accredited manufacturer who can provide engineered drawings of the truss upon request. Aerial Rigging reserves the right to deem equipment unsuitable for hanging if engineered drawings cannot be provided upon request.
- Any articulating/dynamic (i.e. moving) show or performance element must have an arrester device.
- A scale will be used to establish that the actual weight of the equipment agrees with the estimated weights submitted. We will also use load cells to verify the total weight of the rig.
- A steel “safety” is required for each individual item suspended from the ceiling, any supporting structure or truss.
- All electric cables and connections must be UL rated for the amperage capacity required for safe operation and must conform to all local codes.
- All material used must be non-flammable and must conform to the fire regulations of the Fire Marshall.
- Aerial will make all connections to the ceilings and assist your staff in attaching connections to the truss and equipment.
Banner placement, outside of ballrooms and/or meeting rooms, must be approved in advance through your CSM. THANK YOU for trusting Aerial to serve your event.